Sena Hydroelectric Power Plant

Project Summary

  • 1091

  • Kagizman Kars

  • VCS

    Proponent

    HOSDERE ENERJI A.S.
    N.A., Turkey

    VCS Project Status

    Registered

    Estimated Annual Emissions Reductions

    10,000

    VCS Project Type

    Energy industries (renewable/non-renewable sources)

    VCS Methodology

    ACM0002

    VCS Project Validator

    Re-Consult Ltd.

Sena HEPP, which is comprised of the construction of a green field 21.4 MWe hydroelectric power plant located in the Aras river basin 2 in Turkey’s Eastern Anatolia Region. The plant has been projected to comprise a regulator, a head race channel, a head pond, two pen stocks and a power house. The power house building has been planned to consist of two units having outputs of 10.718 MWe each.